MobbleOpen in Mobble ⇢
Eco · Renewable energy · published 2026-09-04 · via Renewable Watch

Construction Starts on 347 MWdc Solar Farm in Texas by OCI Energy and Arava Power

OCI Energy and Arava Power have started building a 347 MWdc solar project in Texas. This marks a notable step in expanding utility-scale solar capacity in the United States. The project is expected to bolster the state's renewable energy portfolio.

Expanded Detail

EXPANDED:

Groundbreaking has officially commenced for a large-scale photovoltaic installation in Texas. The 347 megawatts of direct current (MWdc) capacity represents a significant addition to the state's utility-scale generation infrastructure.

This development, led by OCI Energy and Arava Power, signals continued momentum for large solar arrays across the United States. The initiative is designed to

Expanded detail and Context are AI-generated analysis; the linked article remains the authoritative source.
Read the full article at Renewable Watch →
Related stories
Grid United's ambitious plan to interconnect three regional power systems · Renewable energy
Blacktail and RayGen Partner to Develop Combined Geothermal-Solar-Storage Hub in Texas · Renewable energy
U.S. Grid Battery Installations Hit All-Time Quarterly High · Renewable energy
Indonesia Launches 5.3 GW Solar Push; Canada Unveils $70B Clean Energy Plan · Renewable energy
This summary is AI-generated and original to Mobble; the linked article is the authoritative source. Original headline: “OCI Energy and Arava Power begin construction of 347 MWdc solar project in Texas.” Browse more stories.