Tata Power tests membrane-based floating solar at Maharashtra reservoir
Tata Power has partnered with Norway-based Ocean Sun to introduce membrane-based floating solar technology in India. The companies will develop an approximately 300 kWp pilot project at Tata Power's Mulshi reservoir in Maharashtra, using a thin hydro-elastic membrane that floats directly on the water instead of pontoon structures. The pilot will evaluate the technology's performance, reliability, cost competitiveness and scalability under Indian conditions.
[paragraphs]
[paragraph] Need ensure no extra. Should we include blank line between paragraphs? Yes. Under 120 words total for EXPANDED. We have 49+67=116. Good. Need maybe "Tata Power has partnered..." first. "The trial..." second. Good. Potential issue: "group captive solar project" maybe jargon. Fine. "commissioned" source. "expected to generate..." source. We are using exact numbers. Fine. Need ensure "entirely original wording, never copying source phrasing." We have some