MobbleOpen in Mobble ⇢
Eco · Renewable energy · published 2026-10-09 · via GreentechLead

South Africa solar module deal; Romanian PV plant completed; German wind repowering begins

Image via GreentechLead
Image via GreentechLead

Infinity Power awarded AIKO contracts to supply photovoltaic modules for 773.5 MWp of South African projects, including Highveld Solar and the Ngwedi Cluster. Parapet completed a 32 MWp solar farm in Dănești, Romania, for an Alerion Clean Power subsidiary, with expected annual generation of 52 GWh. VSB started construction on an 18 MW wind repowering project in Rastede, Germany, replacing four older turbines with three 6 MW Vestas units.

Expanded Detail

EXPANDED:

Infinity Power's awards to AIKO cover 773.5 MWp in South Africa, spanning Highveld Solar and the Ngwedi Cluster's Onderstepoort Solar 1 and 2. AIKO will supply all-back-contact modules. The companies say their African collaboration now exceeds 2 GWp. Parapet finished the 32 MWp Dănești plant in Călărași County for Alerion subsidiary Conti Energie Verde, using about 50,000 640 Wp modules, over 860 trackers and 380 km of cabling. It is expected to produce 52 GWh yearly, enough for roughly 20,000 homes, and belongs to a seven-project, ~80 MWp Romania-Italy contract.

VSB began building the 18 MW Liethe-Lehmden repowering scheme in Rastede, Lower Saxony. It replaces four 0.9 MW turbines (3.6 MW total) with three 6 MW Vestas V150 machines. Capacity should rise fivefold and annual output more than tenfold, potentially matching about 11,300 three-person households. Completion is targeted for late summer 2027. VSB's first Lower Saxony wind farm, it follows approval of the nearby 14 MW Oldenbrok Süd project in July 2026.

Count first para: Infinity(1) Power's2 awards3 to4 AIKO5 cover6 773.5? maybe one. MWp8 in9 South10 Africa11 spanning12 Highveld13 Solar14 and15 the16 Ngwedi17 Cluster's18 Onderstepoort19 Solar20 1?21 and22 2?23. AIKO24 will25 supply26 all-back-contact27 modules28. The29 companies30 say31 their32 African33 collaboration34 now35 exceeds36 2?37 GWp38. Parapet39 finished40 the41 32?42 MWp43 Dănești44 plant45 in46 Călărași47 County48 for49 Alerion50 subsidiary51

Expanded detail and Context are AI-generated analysis; the linked article remains the authoritative source.
Read the full article at GreentechLead →
Related stories
Oracle wind VPPA; Eurowind Romania battery online; Olana Finnish storage projects · Renewable energy
Major wind and solar projects advance across Vietnam, Austria, and India · Renewable energy
EWE to supply tesa with green hydrogen under German deal · Renewable energy
Coca-Cola HBC signs solar-storage PPA; MaxSolar battery deal; green ammonia supply for Korea · Renewable energy
This summary is Al-enhanced to contain extended analysis and broader social context. The original is {NAME); the linked article is the authoritative source. Original headline: “Renewable energy news: Infinity Power, AIKO, Parapet, VSB.” Browse more stories.